Check the meanings of the following words and expressions:
delay
anniversary
procuring
priority
integrating
design concept
our clinical needs
clinical experience
strengthen the cooperative ties
itinerary
1. What has Karen been assigned to do? A. learn of the correct parameter settings and the optimal coil B. connect the broker to the MRI system through the hospital’s Intranet C. procure advanced MRI instrumentation for her hospital
2.What is Karen evaluating the feasibility of? A. using the 1.5 Tesla MRI in performing as many patient examinations daily B. determining the pulse sequences for various diseases C. connecting the broker to the MRI system through the hospital’s Intranet
3.What does integrating the MRI and PACS systems depends strongly on? A. varying pulse sequences
B. the communication gateway
C. the patient’s work-list generated by the PACS server
4. What is Karen’s purpose in evaluating the feasibility of using the 1.5 Tesla MRI?
A. to learn of the correct parameter settings and the optimal coil B. to perform as many patient examinations daily C. to determine the pulse sequences for various diseases
5. What occurs in GE’s MRI system?
A. varying pulse sequences are developed
B. the broker is connected to the MRI system through the hospital’s Intranet
C. the MRI and PACS systems are integrated
Score =
Post-Listening Exercise
Write a letter to make a technical visit overseas by including the following contents:
1. Requesting permission to make a technical visit
科技訪問許可申請
2. Stating the purpose of the technical visit
闡述科技訪問的目地
3. Introducing one’s qualifications or one’s organizational experiences
介紹某人的能力或機構經驗
4. Commending the organization to be visited
對訪問機構的讚揚
5. Outlining details of the technical visit
詳述科技訪問的細節
6. Requesting confirmation for approval of the
technical visit 科技訪問核准的確認申請
Refer to additional examples of correspondence at
http://www.chineseowl.idv.tw/html/correspondence/